Operations console
Operations overview
Leading indicators first. Job counts and revenue sit one level down, because optimising them directly would optimise the wrong thing.
kWh recovered (30-day run rate)
119.0 MWh
Across 100 completed visits with before and after readings
Fleet performance ratio
74.2%
Capacity-weighted across 31 sites, last 30 days
74.2% against a 82% targetbelow target
SLA compliance
90.0%
90 of 100 closed jobs met their promised window
90.0% against a 95% targetbelow target
kW under contract
1,311 kW
15 active contracts, 2 at renewal risk
Driven by measured performance drift, not a cleaning calendar. The money column is what the customer is losing every month while the dust sits there.
| Site | Soiling loss | Days since clean | Losing per month |
|---|---|---|---|
| Al-Noor Textile Mills - Unit 1 Islamabad · 200.0 kW | 15.2% | 137 | Rs 1.7L |
| Metro Warehousing - Unit 1 Islamabad · 250.0 kW | 13.5% | 80 | Rs 1.6L |
| Green Valley School Rawalpindi · 250.0 kW | 9.6% | 46 | Rs 1.3L |
| Indus Packaging Ltd Rawalpindi · 150.0 kW | 12.9% | 61 | Rs 83.2K |
| Al-Noor Textile Mills - Unit 2 Islamabad · 100.0 kW | 9.2% | 39 | Rs 46.8K |
| Gulberg Galleria - Unit 1 Faisalabad · 60.0 kW | 13.0% | 135 | Rs 36.1K |
| Crescent Plaza - Unit 2 Faisalabad · 32.0 kW | 19.7% | 118 | Rs 35.0K |
| Pak Agro Farms - Unit 1 Karachi · 25.0 kW | 17.0% | 45 | Rs 24.9K |
25 visits booked for today
- Shade Analysis
Pak Agro Farms - Unit 2 · Karachi
8:00 AM
Dispatched - Drone Solar Inspection
Zubair Hashmi · Islamabad
8:00 AM
In progress - Same-Day Repair
Hina Qureshi · Rawalpindi
8:00 AM
In progress - Insulation Resistance Testing
Kamran Yousaf · Lahore
9:00 AM
Dispatched - Thermal Camera Inspection
Rabia Nawaz · Rawalpindi
9:00 AM
Dispatched - Insurance Inspection
Crescent Plaza - Unit 2 · Faisalabad
9:00 AM
Scheduled - Same-Day Repair
Al-Noor Textile Mills - Unit 1 · Islamabad
9:00 AM
In progress
Open jobs due within 12 hours, soonest first.
- JOB-2026-000118 hrs late
Insulation Resistance Testing
- JOB-2026-014418 hrs late
Preventive Maintenance
- JOB-2026-003314 hrs late
Battery Check & Replacement
- JOB-2026-016414 hrs late
Performance Testing
- JOB-2026-008313 hrs late
On-Grid Solar System
- JOB-2026-008813 hrs late
Solar System Routine Checking
Unresolved defects recorded on site.
JOB-2026-0007
- Burnt MC4 connectorCritical
JOB-2026-0021
JOB-2026-0021
JOB-2026-0023
- Burnt MC4 connectorCritical
JOB-2026-0023
JOB-2026-0027
Repeat call-outs mean the root cause was never fixed. Rising here is a warning, not a revenue win.
Where the pipeline is sitting right now.
Booked hours against weekly capacity.
- Junaid Khan89% · 5 open
- Danish Ali82% · 8 open
- Shoaib Akhtar80% · 7 open
- Waqar Ahmed76% · 2 open
- Faisal Shahzad76% · 7 open
- Rizwan Sattar64% · 5 open
Targets held for FONO Energy: SLA 95%, performance ratio 82%. Both are absolute, not rolling averages, so a slipping standard stays visible. Data last modelled 3 days ago.