Operations console
Prototype - no backend
Customers
Pak Agro Farms - Unit 1
25.0 kW Hybrid system in Karachi, commissioned 20 Mar 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
25.0 kW Hybrid system in Karachi, commissioned 20 Mar 2024
System health
80
Performance ratio against baseline, less open defects
Generated (30 days)
2.4 MWh
86% of expected
Modelled soiling loss
17.0%
Last cleaned 4 Jul 2026
Performance ratio
68.8%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
5 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0105 | Industrial Solar Installation | Scheduled | Rs 24 |
| JOB-2026-0036 | Warranty Claims | Scheduled | Rs 4.5K |
| JOB-2026-0089 | Solar System Upgradation | Invoiced | Rs 2.9L |
| JOB-2026-0032 | Dust & Debris Removal | Completed | Rs 3.2K |
| JOB-2026-0086 | Technical Reports | Completed | Rs 6.5K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.