Operations console
Prototype - no backend
Customers
Pak Agro Farms - Unit 2
25.0 kW On-Grid system in Karachi, commissioned 27 Mar 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
25.0 kW On-Grid system in Karachi, commissioned 27 Mar 2024
System health
90
Performance ratio against baseline, less open defects
Generated (30 days)
2.6 MWh
91% of expected
Modelled soiling loss
8.8%
Last cleaned 6 Aug 2026
Performance ratio
78.6%
Baseline 86%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Monitoring app not configured
InfoCustomer has no visibility of live generation. App setup offered.
7 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0072 | Solar Relocation (Shifting) | In progress | Rs 1.8L |
| JOB-2026-0010 | Shade Analysis | Dispatched | Rs 8.5K |
| JOB-2026-0143 | Commercial Solar Maintenance | Cancelled | Rs 18.0K |
| JOB-2026-0048 | Warranty Claims | Completed | Rs 4.5K |
| JOB-2026-0099 | Solar Panel Repair | Completed | Rs 1.6L |
| JOB-2026-0094 | Earthing Installation | Completed | Rs 18.5K |
| JOB-2026-0104 | Smart Energy Monitoring App Setup | Invoiced | Rs 6.5K |
18 Jun 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.