Operations console

Customers

Al-Noor Textile Mills - Unit 1

200.0 kW On-Grid system in Islamabad, commissioned 3 Nov 2024

System health

83

Performance ratio against baseline, less open defects

Generated (30 days)

19.7 MWh

87% of expected

Modelled soiling loss

15.2%

Last cleaned 3 Apr 2026

Performance ratio

70.0%

Baseline 81%, target 82%

Generation, expected against actual

Ninety days. The dashed line is the design expectation; the gap between the lines is money.

Soiling loss

Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.

Performance ratio trend

Against the fleet target.

System specification
Capacity
200.0 kW
System type
On-Grid
Modules
342 x 585W Longi
Inverter
Solis S6-GR1P-200K (180.0 kW)
Battery
None
Tilt / azimuth
27 deg / 170 deg
Bird mesh
Installed
Tariff
Rs 50 per kWh
Net metering
Approved
NM reference
NM-2024-37522
Sanctioned
200 kW
AMC
No contract
Open findings

Unresolved defects on this site.

  • Monitoring app not configured

    Info

    Customer has no visibility of live generation. App setup offered.

  • Warranty documents missing

    Info

    Module warranty pack not on file. Copies requested from the original installer.

Work order history

7 visits

CodeServiceStatusAmount
JOB-2026-0140Same-Day RepairIn progressRs 16.5K
JOB-2026-0016System Health AuditInvoicedRs 12.0K
JOB-2026-0004Earthing & Safety InspectionScheduledRs 6.2K
JOB-2026-0008Residential Solar MaintenanceInvoicedRs 6.5K
JOB-2026-0046Solar Panel Deep CleaningInvoicedRs 75.2K
JOB-2026-0166Performance OptimizationCompletedRs 1.9L
JOB-2026-0074Free Performance ReportInvoicedRs 0
Inspection reports

Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.