Hybrid Solar System
JOB-2026-0064 - raised via Field survey 2 mo ago
InvoicedNormal priorityQuarterly Care AMC
Operations console
JOB-2026-0064 - raised via Field survey 2 mo ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Earthing resistance above limit
Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
Resolved
Consumed from van stock on this visit.
| Part | Qty | Unit cost | Line total |
|---|---|---|---|
| Earthing Rod 5ft | 2 | Rs 23,816 | Rs 47,632 |
| Soft Wash Brush Head | 3 | Rs 5,940 | Rs 17,820 |
Generation either side of the visit.
32 kWh before, 38 kWh after
Worth about Rs 9,180 a month at this site's tariff.
Technician
Tahir Mahmood