Operations console

Customers

Metro Warehousing - Unit 1

250.0 kW On-Grid system in Islamabad, commissioned 1 Apr 2025

System health

86

Performance ratio against baseline, less open defects

Generated (30 days)

24.8 MWh

88% of expected

Modelled soiling loss

13.5%

Last cleaned 30 May 2026

Performance ratio

72.4%

Baseline 83%, target 82%

Generation, expected against actual

Ninety days. The dashed line is the design expectation; the gap between the lines is money.

Soiling loss

Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.

Performance ratio trend

Against the fleet target.

System specification
Capacity
250.0 kW
System type
On-Grid
Modules
427 x 585W Jinko
Inverter
GoodWe DNS-G3-250K (225.0 kW)
Battery
None
Tilt / azimuth
19 deg / 190 deg
Bird mesh
Not installed
Tariff
Rs 43 per kWh
Net metering
Renewal due
NM reference
NM-2023-94792
Sanctioned
250 kW
AMC
Annual Plus
Open findings

Unresolved defects on this site.

  • Loose structure bolt

    Minor

    Two mid-clamps below torque specification on the north row. Retorqued.

Work order history

6 visits

CodeServiceStatusAmount
JOB-2026-0153Same-Day RepairCompletedRs 16.5K
JOB-2026-0117Smart Energy Monitoring App SetupInvoicedRs 6.5K
JOB-2026-0076Waterless Panel CleaningInvoicedRs 1.1L
JOB-2026-0116Farm Solar MaintenanceInvoicedRs 21.0K
JOB-2026-0121Annual Maintenance Contract (AMC)CompletedRs 48.0K
JOB-2026-0097Bird Dropping RemovalCompletedRs 3.5K
Inspection reports

Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.