Operations console
Prototype - no backend
Customers
Metro Warehousing - Unit 1
250.0 kW On-Grid system in Islamabad, commissioned 1 Apr 2025
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
250.0 kW On-Grid system in Islamabad, commissioned 1 Apr 2025
System health
86
Performance ratio against baseline, less open defects
Generated (30 days)
24.8 MWh
88% of expected
Modelled soiling loss
13.5%
Last cleaned 30 May 2026
Performance ratio
72.4%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Loose structure bolt
MinorTwo mid-clamps below torque specification on the north row. Retorqued.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0153 | Same-Day Repair | Completed | Rs 16.5K |
| JOB-2026-0117 | Smart Energy Monitoring App Setup | Invoiced | Rs 6.5K |
| JOB-2026-0076 | Waterless Panel Cleaning | Invoiced | Rs 1.1L |
| JOB-2026-0116 | Farm Solar Maintenance | Invoiced | Rs 21.0K |
| JOB-2026-0121 | Annual Maintenance Contract (AMC) | Completed | Rs 48.0K |
| JOB-2026-0097 | Bird Dropping Removal | Completed | Rs 3.5K |
9 Jun 2026