Operations console
Prototype - no backend
Customers
Crescent Plaza - Unit 2
32.0 kW Hybrid system in Faisalabad, commissioned 16 Mar 2022
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
32.0 kW Hybrid system in Faisalabad, commissioned 16 Mar 2022
System health
72
Performance ratio against baseline, less open defects
Generated (30 days)
2.9 MWh
80% of expected
Modelled soiling loss
19.7%
Last cleaned 22 Apr 2026
Performance ratio
67.5%
Baseline 84%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Loose structure bolt
MinorTwo mid-clamps below torque specification on the north row. Retorqued.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0101 | Insurance Inspection | Scheduled | Rs 9.5K |
| JOB-2026-0162 | Loose Connection Fix | Invoiced | Rs 3.6K |
| JOB-2026-0169 | Fuse Replacement | Completed | Rs 1.9K |
| JOB-2026-0061 | Thermal Camera Inspection | Cancelled | Rs 22.4K |
4 Jul 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.