Operations console
Prototype - no backend
Customers
Chughtai Diagnostic Centre
50.0 kW Hybrid system in Lahore, commissioned 3 Dec 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
50.0 kW Hybrid system in Lahore, commissioned 3 Dec 2024
System health
86
Performance ratio against baseline, less open defects
Generated (30 days)
5.0 MWh
88% of expected
Modelled soiling loss
7.6%
Last cleaned 26 May 2026
Performance ratio
74.0%
Baseline 84%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
7 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0066 | Battery Check & Replacement | Dispatched | Rs 38.0K |
| JOB-2026-0043 | Electrical Safety Audit | Requested | Rs 15.0K |
| JOB-2026-0103 | Earthing Installation | Scheduled | Rs 18.5K |
| JOB-2026-0098 | Fire Safety Inspection | Invoiced | Rs 7.5K |
| JOB-2026-0110 | Fuse Replacement | Invoiced | Rs 1.9K |
| JOB-2026-0059 | Combiner Box Repair | Invoiced | Rs 7.8K |
| JOB-2026-0067 | Inverter Repair & Maintenance | Completed | Rs 14.5K |
12 Feb 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.