50.0 kW Hybrid system in Lahore, commissioned 3 Dec 2024

System health

86

Performance ratio against baseline, less open defects

Generated (30 days)

5.0 MWh

88% of expected

Modelled soiling loss

7.6%

Last cleaned 26 May 2026

Performance ratio

74.0%

Baseline 84%, target 82%

Generation, expected against actual

Ninety days. The dashed line is the design expectation; the gap between the lines is money.

Soiling loss

Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.

Performance ratio trend

Against the fleet target.

System specification
Capacity
50.0 kW
System type
Hybrid
Modules
81 x 620W JA Solar
Inverter
Growatt MIN-TL-X-50K (45.0 kW)
Battery
10 kWh
Tilt / azimuth
24 deg / 170 deg
Bird mesh
Not installed
Tariff
Rs 46 per kWh
Net metering
Approved
NM reference
NM-2025-27759
Sanctioned
50 kW
AMC
Annual Plus
Open findings

Unresolved defects on this site.

  • Bird nesting under array

    Minor

    Pigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.

Work order history

7 visits

CodeServiceStatusAmount
JOB-2026-0066Battery Check & ReplacementDispatchedRs 38.0K
JOB-2026-0043Electrical Safety AuditRequestedRs 15.0K
JOB-2026-0103Earthing InstallationScheduledRs 18.5K
JOB-2026-0098Fire Safety InspectionInvoicedRs 7.5K
JOB-2026-0110Fuse ReplacementInvoicedRs 1.9K
JOB-2026-0059Combiner Box RepairInvoicedRs 7.8K
JOB-2026-0067Inverter Repair & MaintenanceCompletedRs 14.5K
Inspection reports

Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.