Operations console
Prototype - no backend
Customers
Gulberg Galleria - Unit 1
60.0 kW Off-Grid system in Faisalabad, commissioned 7 Jan 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
60.0 kW Off-Grid system in Faisalabad, commissioned 7 Jan 2024
System health
89
Performance ratio against baseline, less open defects
Generated (30 days)
6.0 MWh
89% of expected
Modelled soiling loss
13.0%
Last cleaned 5 Apr 2026
Performance ratio
70.9%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0160 | Hybrid Solar System | Dispatched | Rs 32 |
| JOB-2026-0102 | Performance Optimization | Requested | Rs 57.0K |
| JOB-2026-0108 | Commercial Solar Maintenance | Scheduled | Rs 18.0K |
| JOB-2026-0083 | On-Grid Solar System | Scheduled | Rs 27 |
| JOB-2026-0037 | MC4 Connector Replacement | Completed | Rs 850 |
| JOB-2026-0019 | Lightning Protection | Completed | Rs 1.1L |
15 Jun 2026
22 Mar 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.