JOB-2026-0095 - raised via Portal 4 mo ago

CompletedLow priorityAnnual Basic AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Loose structure bolt

    Minor

    Two mid-clamps below torque specification on the north row. Retorqued.

    Resolved

  • Hotspot detected on string B

    Critical

    Thermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.

    Open

Parts used

Consumed from van stock on this visit.

No parts consumed

Result

Generation either side of the visit.

+7 kWhper day

28 kWh before, 35 kWh after

Worth about Rs 11,550 a month at this site's tariff.

Assignment

Technician

Danish Ali
Details
Customer
Nadia Rehman
City
Faisalabad
Capacity
7.5 kW
Raised
6 Apr 2026, 2:00 PM
Scheduled
9 Apr 2026, 8:00 PM
SLA due
8 Apr 2026, 2:00 PM (4 mo ago)
Completed
9 Apr 2026, 8:00 PM
Services
Hybrid Solar System
Amount
Rs 32