Operations console

All work orders

Solar Panel Repair

JOB-2026-0023 - raised via Phone 3 mo ago

CompletedNormal priorityRepeat visit - review root cause
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Earthing resistance above limit

    Major

    Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.

    Open

  • Burnt MC4 connector

    Critical

    DC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.

    Open

Parts used

Consumed from van stock on this visit.

No parts consumed

Result

Generation either side of the visit.

+20 kWhper day

78 kWh before, 98 kWh after

Worth about Rs 30,000 a month at this site's tariff.

Assignment

Technician

Naveed Iqbal
Details
City
Multan
Capacity
25.0 kW
Raised
31 May 2026, 11:00 AM
Scheduled
3 Jun 2026, 8:00 AM
SLA due
3 Jun 2026, 11:00 AM (3 mo ago)
Completed
3 Jun 2026, 8:00 AM
Services
Solar Panel Repair
Amount
Rs 163,400
Notes

Repeat visit for the same fault. Root cause review required before another call-out.