Solar Panel Repair
JOB-2026-0023 - raised via Phone 3 mo ago
CompletedNormal priorityRepeat visit - review root cause
Operations console
JOB-2026-0023 - raised via Phone 3 mo ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Earthing resistance above limit
Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
Open
Burnt MC4 connector
DC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
Open
Consumed from van stock on this visit.
No parts consumed
Generation either side of the visit.
78 kWh before, 98 kWh after
Worth about Rs 30,000 a month at this site's tariff.
Technician
Naveed IqbalRepeat visit for the same fault. Root cause review required before another call-out.