String Testing
JOB-2026-0038 - raised via AMC schedule 1 mo ago
InvoicedHigh priorityQuarterly Care AMC
Operations console
JOB-2026-0038 - raised via AMC schedule 1 mo ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Loose structure bolt
Two mid-clamps below torque specification on the north row. Retorqued.
Resolved
Hotspot detected on string B
Thermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
Open
Consumed from van stock on this visit.
| Part | Qty | Unit cost | Line total |
|---|---|---|---|
| Module 585W Mono | 4 | Rs 27,303 | Rs 109,212 |
| Mid Clamp 35mm | 1 | Rs 9,381 | Rs 9,381 |
Generation either side of the visit.
19 kWh before, 20 kWh after
Worth about Rs 1,680 a month at this site's tariff.
Technician
Faisal Shahzad