Operations console
Prototype - no backend
Customers
Metro Warehousing - Unit 2
250.0 kW On-Grid system in Islamabad, commissioned 27 Oct 2020
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
250.0 kW On-Grid system in Islamabad, commissioned 27 Oct 2020
System health
77
Performance ratio against baseline, less open defects
Generated (30 days)
26.8 MWh
95% of expected
Modelled soiling loss
5.0%
Last cleaned 29 Jun 2026
Performance ratio
79.1%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Burnt MC4 connector
CriticalDC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
Earthing resistance above limit
MajorMeasured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0106 | MC4 Connector Replacement | Scheduled | Rs 850 |
| JOB-2026-0151 | Commercial Solar Installation | Requested | Rs 26 |
| JOB-2026-0092 | Fuse Replacement | Scheduled | Rs 2.9K |
| JOB-2026-0040 | Shade Analysis | Completed | Rs 8.5K |
| JOB-2026-0068 | Waterless Panel Cleaning | Invoiced | Rs 1.2L |
| JOB-2026-0142 | Commercial Solar Installation | Completed | Rs 26 |
No reports for this site