Earthing Resistance Testing
RPT-2026-021 - performed 25 Jun 2026 by Naveed Iqbal
Health score
94
Measurements taken
6
1 outside reference
Findings
2
Customer visibility
Shared
Measurements
Each reading against the reference it is judged by.
| Measurement | Reading | Reference | Result |
|---|---|---|---|
| Open circuit voltage (string A) | 741 V | Within 5% of design | Pass |
| Short circuit current (string A) | 10.4 A | Within 8% of nameplate | Pass |
| Earth electrode resistance | 4.7 ohm | Below 5 ohm | Pass |
| Insulation resistance (DC+ to earth) | 71 Mohm | Above 1 Mohm | Pass |
| Max module temperature | 54 C | Below 25 C above ambient | Outside reference |
| Performance ratio on test day | 75% | Baseline 81% | Pass |
Context
- Site
- Imran Baig
- Customer
- Imran Baig
- Capacity
- 15.0 kW
- Work order
- JOB-2026-0154
- Technician
- Naveed Iqbal
Recommendation
System is healthy. Continue the current cleaning cycle and re-inspect in six months.
Score 94 / 100Findings
Defects recorded during this inspection.
Loose structure bolt
MinorResolvedTwo mid-clamps below torque specification on the north row. Retorqued.
Bird nesting under array