Operations console

All work orders

Fuse Replacement

JOB-2026-0158 - raised via Field survey 2 mo ago

InvoicedLow priorityQuarterly Care AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Inverter derating in afternoon peak

    Major

    Unit throttles above 46 degrees ambient. Cooling fins clogged with dust.

    Resolved

  • Heavy soiling on lower rows

    Minor

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.

    Resolved

  • Earthing resistance above limit

    Major

    Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.

    Open

Parts used

Consumed from van stock on this visit.

PartQtyUnit costLine total
Combiner Box 4-in-13Rs 38,311Rs 114,933
MC4 Connector Pair3Rs 33,125Rs 99,375
Result

Generation either side of the visit.

+1 kWhper day

21 kWh before, 22 kWh after

Worth about Rs 1,680 a month at this site's tariff.

Assignment

Technician

Faisal Shahzad
Details
Customer
Hina Qureshi
City
Rawalpindi
Capacity
7.5 kW
Raised
13 Jun 2026, 1:00 PM
Scheduled
16 Jun 2026, 6:00 PM
SLA due
15 Jun 2026, 1:00 PM (2 mo ago)
Completed
16 Jun 2026, 6:00 PM
Services
Fuse Replacement
Amount
Rs 1,900