Hotspot Detection
JOB-2026-0134 - raised via AMC schedule 6 mo ago
CompletedLow priorityAnnual Plus AMC
Operations console
JOB-2026-0134 - raised via AMC schedule 6 mo ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Earthing resistance above limit
Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
Open
Consumed from van stock on this visit.
| Part | Qty | Unit cost | Line total |
|---|---|---|---|
| Combiner Box 4-in-1 | 4 | Rs 38,311 | Rs 153,244 |
| End Clamp 35mm | 1 | Rs 34,454 | Rs 34,454 |
Generation either side of the visit.
75 kWh before, 95 kWh after
Worth about Rs 22,800 a month at this site's tariff.
Technician
Naveed Iqbal