Al-Noor Textile Mills - Unit 2

100.0 kW On-Grid system in Islamabad, commissioned 19 Jun 2024

System health

92

Performance ratio against baseline, less open defects

Generated (30 days)

10.5 MWh

92% of expected

Modelled soiling loss

9.2%

Last cleaned 10 Jul 2026

Performance ratio

79.4%

Baseline 86%, target 82%

Generation, expected against actual

Ninety days. The dashed line is the design expectation; the gap between the lines is money.

Soiling loss

Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.

Performance ratio trend

Against the fleet target.

System specification
Capacity
100.0 kW
System type
On-Grid
Modules
171 x 585W Trina
Inverter
Solis S6-GR1P-100K (90.0 kW)
Battery
None
Tilt / azimuth
28 deg / 200 deg
Bird mesh
Not installed
Tariff
Rs 45 per kWh
Net metering
Renewal due
NM reference
NM-2022-81770
Sanctioned
100 kW
AMC
No contract
Open findings

Unresolved defects on this site.

No open findings

Work order history

4 visits

CodeServiceStatusAmount
JOB-2026-008025-Year Performance MonitoringRequestedRs 96.0K
JOB-2026-0138Farm Solar MaintenanceDispatchedRs 21.0K
JOB-2026-0073School & Hospital Solar MaintenanceCompletedRs 24.0K
JOB-2026-0113Warranty ClaimsInvoicedRs 4.5K
Inspection reports

Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.