5.0 kW Hybrid system in Rawalpindi, commissioned 2 Feb 2023
System health
72
Performance ratio against baseline, less open defects
Generated (30 days)
488 kWh
86% of expected
Modelled soiling loss
14.9%
Last cleaned 16 May 2026
Performance ratio
69.2%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 5.0 kW
- System type
- Hybrid
- Modules
- 9 x 555W JA Solar
- Inverter
- Growatt MIN-TL-X-5K (4.5 kW)
- Battery
- 20 kWh
- Tilt / azimuth
- 28 deg / 190 deg
- Bird mesh
- Not installed
- Tariff
- Rs 56 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-24009
- Sanctioned
- 5 kW
- AMC
- Quarterly Care
Unresolved defects on this site.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
9 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0014 | Thermal Camera Inspection | Dispatched | Rs 3.5K |
| JOB-2026-0062 | Solar Relocation (Shifting) | Completed | Rs 36.0K |
| JOB-2026-0091 | Bird Dropping Removal | Scheduled | Rs 3.5K |
| JOB-2026-0122 | Loose Connection Fix | Invoiced | Rs 3.6K |
| JOB-2026-0038 | String Testing | Invoiced | Rs 6.8K |
| JOB-2026-0013 | Performance Testing | Invoiced | Rs 9.0K |
| JOB-2026-0082 | MC4 Connector Replacement | Completed | Rs 850 |
| JOB-2026-0112 | Dust & Debris Removal | Completed | Rs 3.2K |
| JOB-2026-0028 | Lightning Protection | Cancelled | Rs 9.0K |