Operations console
Prototype - no backend
Customers
Nadia Rehman
7.5 kW On-Grid system in Faisalabad, commissioned 26 Feb 2020
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
7.5 kW On-Grid system in Faisalabad, commissioned 26 Feb 2020
System health
68
Performance ratio against baseline, less open defects
Generated (30 days)
720 kWh
86% of expected
Modelled soiling loss
6.6%
Last cleaned 16 Jun 2026
Performance ratio
71.2%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
5 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0118 | Commercial Solar Installation | Requested | Rs 26 |
| JOB-2026-0084 | On-Grid Solar System | Cancelled | Rs 27 |
| JOB-2026-0095 | Hybrid Solar System | Completed | Rs 32 |
| JOB-2026-0127 | Solar Panel Repair | Completed | Rs 53.2K |
| JOB-2026-0007 | Factory Solar Maintenance | Invoiced | Rs 32.0K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.