Operations console
Prototype - no backend
Customers
Hina Qureshi
7.5 kW Hybrid system in Rawalpindi, commissioned 12 Apr 2025
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
7.5 kW Hybrid system in Rawalpindi, commissioned 12 Apr 2025
System health
86
Performance ratio against baseline, less open defects
Generated (30 days)
773 kWh
92% of expected
Modelled soiling loss
8.2%
Last cleaned 18 Jul 2026
Performance ratio
77.1%
Baseline 84%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Earthing resistance above limit
MajorMeasured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0149 | Same-Day Repair | In progress | Rs 16.5K |
| JOB-2026-0133 | Solar Panel Repair | Completed | Rs 45.6K |
| JOB-2026-0158 | Fuse Replacement | Invoiced | Rs 1.9K |
| JOB-2026-0070 | Annual Maintenance Contract (AMC) | Completed | Rs 48.0K |
16 Jun 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.