Operations console

All work orders

Technical Reports

JOB-2026-0009 - raised via Portal 4 mo ago

InvoicedNormal priorityAnnual Plus AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Loose structure bolt

    Minor

    Two mid-clamps below torque specification on the north row. Retorqued.

    Open

Parts used

Consumed from van stock on this visit.

PartQtyUnit costLine total
Bird Mesh Roll 30m2Rs 34,519Rs 69,038
Result

Generation either side of the visit.

+9 kWhper day

81 kWh before, 90 kWh after

Worth about Rs 10,260 a month at this site's tariff.

Assignment

Technician

Naveed Iqbal
Details
City
Multan
Capacity
25.0 kW
Raised
19 Apr 2026, 9:00 AM
Scheduled
19 Apr 2026, 8:00 PM
SLA due
20 Apr 2026, 9:00 AM (4 mo ago)
Completed
19 Apr 2026, 8:00 PM
Services
Technical Reports
Amount
Rs 6,500