Operations console
Prototype - no backend
Customers
Rehmat Flour Mills
50.0 kW On-Grid system in Karachi, commissioned 21 Nov 2025
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
50.0 kW On-Grid system in Karachi, commissioned 21 Nov 2025
System health
87
Performance ratio against baseline, less open defects
Generated (30 days)
4.9 MWh
87% of expected
Modelled soiling loss
9.5%
Last cleaned 1 Jul 2026
Performance ratio
72.2%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
5 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0136 | On-Grid Solar System | Scheduled | Rs 27 |
| JOB-2026-0056 | Net Metering Assistance | Invoiced | Rs 35.0K |
| JOB-2026-0109 | Farm Solar Maintenance | Completed | Rs 21.0K |
| JOB-2026-0006 | Net Metering Assistance | Completed | Rs 35.0K |
| JOB-2026-0044 | String Testing | Completed | Rs 6.8K |
14 Jun 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.