Operations console
Imran Baig
15.0 kW On-Grid system in Multan, commissioned 26 Jul 2023
System health
82
Performance ratio against baseline, less open defects
Generated (30 days)
1.5 MWh
90% of expected
Modelled soiling loss
12.2%
Last cleaned 26 Jul 2026
Performance ratio
73.1%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 15.0 kW
- System type
- On-Grid
- Modules
- 27 x 555W Canadian Solar
- Inverter
- Huawei SUN2000-15K (13.5 kW)
- Battery
- None
- Tilt / azimuth
- 13 deg / 190 deg
- Bird mesh
- Not installed
- Tariff
- Rs 57 per kWh
- Net metering
- Approved
- NM reference
- NM-2026-39169
- Sanctioned
- 15 kW
- AMC
- Annual Basic
Unresolved defects on this site.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
5 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0154 | Emergency Breakdown Service | Invoiced | Rs 12.5K |
| JOB-2026-0042 | Earthing Installation | Invoiced | Rs 18.5K |
| JOB-2026-0129 | Industrial Solar Installation | Invoiced | Rs 24 |
| JOB-2026-0077 | Annual Maintenance Contract (AMC) | Invoiced | Rs 48.0K |
| JOB-2026-0114 | Preventive Maintenance | Invoiced | Rs 8.5K |
- Shade AnalysisScore 77
12 Mar 2026
- Earthing Resistance TestingScore 73
16 May 2026
- Thermal Camera InspectionScore 94
1 May 2026
- Earthing Resistance TestingScore 94
25 Jun 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.