Operations console
Prototype - no backend
Customers
Sana Iqbal
10.0 kW Hybrid system in Karachi, commissioned 18 Apr 2020
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
10.0 kW Hybrid system in Karachi, commissioned 18 Apr 2020
System health
84
Performance ratio against baseline, less open defects
Generated (30 days)
1.0 MWh
90% of expected
Modelled soiling loss
8.6%
Last cleaned 8 May 2026
Performance ratio
77.7%
Baseline 86%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0085 | System Health Audit | Scheduled | Rs 12.0K |
| JOB-2026-0111 | Bird Mesh Installation | In progress | Rs 26.0K |
| JOB-2026-0079 | Net Metering Assistance | Cancelled | Rs 35.0K |
| JOB-2026-0132 | IV Curve Testing | Invoiced | Rs 8.5K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.