Ayesha Malik
12.0 kW Hybrid system in Faisalabad, commissioned 2 Nov 2023
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
12.0 kW Hybrid system in Faisalabad, commissioned 2 Nov 2023
System health
86
Performance ratio against baseline, less open defects
Generated (30 days)
1.2 MWh
92% of expected
Modelled soiling loss
10.3%
Last cleaned 19 Jul 2026
Performance ratio
73.0%
Baseline 79%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Earthing resistance above limit
MajorMeasured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0107 | Dust & Debris Removal | Scheduled | Rs 3.2K |
| JOB-2026-0024 | Warehouse Solar Maintenance | Requested | Rs 26.0K |
| JOB-2026-0047 | Solar EV Charger Installation | Invoiced | Rs 84.0K |
| JOB-2026-0058 | Residential Solar Maintenance | Completed | Rs 6.5K |
| JOB-2026-0130 | Shade Analysis | Completed | Rs 8.5K |
| JOB-2026-0170 | Inverter Repair & Maintenance | Completed | Rs 14.5K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.