Commercial Solar Installation
JOB-2026-0142 - raised via Phone 4 mo ago
CompletedNormal priorityAnnual Plus AMC
Operations console
JOB-2026-0142 - raised via Phone 4 mo ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Earthing resistance above limit
Measured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
Open
Loose structure bolt
Two mid-clamps below torque specification on the north row. Retorqued.
Resolved
Consumed from van stock on this visit.
No parts consumed
Generation either side of the visit.
737 kWh before, 910 kWh after
Worth about Rs 212,790 a month at this site's tariff.
Technician
Rizwan Sattar