Operations console
Prototype - no backend
Customers
Ahmed Raza
10.0 kW On-Grid system in Lahore, commissioned 23 Feb 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
10.0 kW On-Grid system in Lahore, commissioned 23 Feb 2024
System health
90
Performance ratio against baseline, less open defects
Generated (30 days)
1.0 MWh
90% of expected
Modelled soiling loss
8.2%
Last cleaned 9 Apr 2026
Performance ratio
72.0%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0065 | Panel Angle Optimization | Dispatched | Rs 5.8K |
| JOB-2026-0054 | Drone Solar Inspection | Requested | Rs 9.0K |
| JOB-2026-0026 | Performance Optimization | Scheduled | Rs 9.5K |
| JOB-2026-0051 | Net Metering Assistance | Invoiced | Rs 35.0K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.