Operations console
Prototype - no backend
Customers
Falcon Logistics - Unit 2
32.0 kW Hybrid system in Lahore, commissioned 26 Feb 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
32.0 kW Hybrid system in Lahore, commissioned 26 Feb 2024
System health
87
Performance ratio against baseline, less open defects
Generated (30 days)
3.2 MWh
89% of expected
Modelled soiling loss
14.0%
Last cleaned 15 Apr 2026
Performance ratio
71.3%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
Monitoring app not configured
InfoCustomer has no visibility of live generation. App setup offered.
1 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0163 | Warehouse Solar Maintenance | Invoiced | Rs 26.0K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.