Operations console
Prototype - no backend
Customers
Falcon Logistics - Unit 1
32.0 kW Hybrid system in Lahore, commissioned 9 Oct 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
32.0 kW Hybrid system in Lahore, commissioned 9 Oct 2024
System health
87
Performance ratio against baseline, less open defects
Generated (30 days)
3.4 MWh
93% of expected
Modelled soiling loss
9.0%
Last cleaned 2 Aug 2026
Performance ratio
76.9%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
8 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0020 | Waterless Panel Cleaning | In progress | Rs 15.1K |
| JOB-2026-0123 | Inverter Upgrade | Requested | Rs 2.6L |
| JOB-2026-0164 | Performance Testing | Scheduled | Rs 9.0K |
| JOB-2026-0033 | Battery Check & Replacement | Scheduled | Rs 19.0K |
| JOB-2026-0049 | Fuse Replacement | Completed | Rs 1.9K |
| JOB-2026-0027 | Industrial Solar Installation | Completed | Rs 24 |
| JOB-2026-0050 | Performance Testing | Completed | Rs 9.0K |
| JOB-2026-0034 | Performance Optimization | Cancelled | Rs 30.4K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.