Operations console
Prototype - no backend
Customers
Gulberg Galleria - Unit 2
25.0 kW Off-Grid system in Faisalabad, commissioned 16 Jun 2021
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
25.0 kW Off-Grid system in Faisalabad, commissioned 16 Jun 2021
System health
93
Performance ratio against baseline, less open defects
Generated (30 days)
2.6 MWh
93% of expected
Modelled soiling loss
6.1%
Last cleaned 18 Jul 2026
Performance ratio
74.8%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0128 | Complete Inspection & Checkup | Scheduled | Rs 7.5K |
| JOB-2026-0078 | Same-Day Repair | Requested | Rs 16.5K |
| JOB-2026-0155 | Earthing Resistance Testing | Invoiced | Rs 5.2K |
| JOB-2026-0018 | Performance Testing | Completed | Rs 9.0K |
No reports for this site
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.