Operations console
Prototype - no backend
Customers
Crescent Plaza - Unit 1
32.0 kW On-Grid system in Faisalabad, commissioned 27 Aug 2024
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
32.0 kW On-Grid system in Faisalabad, commissioned 27 Aug 2024
System health
90
Performance ratio against baseline, less open defects
Generated (30 days)
3.3 MWh
90% of expected
Modelled soiling loss
13.0%
Last cleaned 28 Jul 2026
Performance ratio
76.4%
Baseline 85%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0119 | Warranty Claims | Dispatched | Rs 4.5K |
| JOB-2026-0031 | Residential Solar Installation | Scheduled | Rs 28 |
| JOB-2026-0090 | Same-Day Repair | Completed | Rs 16.5K |
| JOB-2026-0035 | Solar Panel Deep Cleaning | Completed | Rs 13.0K |
1 May 2026
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.