7.5 kW On-Grid system in Islamabad, commissioned 9 Jun 2024
System health
82
Performance ratio against baseline, less open defects
Generated (30 days)
792 kWh
94% of expected
Modelled soiling loss
4.6%
Last cleaned 2 Jul 2026
Performance ratio
76.1%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 7.5 kW
- System type
- On-Grid
- Modules
- 13 x 585W Longi
- Inverter
- GoodWe DNS-G3-8K (6.8 kW)
- Battery
- None
- Tilt / azimuth
- 25 deg / 190 deg
- Bird mesh
- Not installed
- Tariff
- Rs 49 per kWh
- Net metering
- Approved
- NM reference
- NM-2025-68288
- Sanctioned
- 8 kW
- AMC
- No contract
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
9 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0157 | Solar Panel Deep Cleaning | Scheduled | Rs 2.9K |
| JOB-2026-0096 | Solar Relocation (Shifting) | Scheduled | Rs 54.0K |
| JOB-2026-0063 | Drone Solar Inspection | In progress | Rs 6.8K |
| JOB-2026-0060 | Industrial Solar Installation | Scheduled | Rs 24 |
| JOB-2026-0152 | Solar System Expansion | Scheduled | Rs 71.3K |
| JOB-2026-0131 | Panel Alignment & Tilt Adjustment | Requested | Rs 5.5K |
| JOB-2026-0069 | Commercial Solar Maintenance | Completed | Rs 18.0K |
| JOB-2026-0002 | System Health Audit | Completed | Rs 12.0K |
| JOB-2026-0148 | Off-Grid Solar System | Cancelled | Rs 34 |
No reports for this site