7.5 kW Off-Grid system in Islamabad, commissioned 16 Feb 2021
Generation figures are modelled for the prototype from a fixed seed, so they are identical on every visit.
Operations console
7.5 kW Off-Grid system in Islamabad, commissioned 16 Feb 2021
System health
92
Performance ratio against baseline, less open defects
Generated (30 days)
770 kWh
92% of expected
Modelled soiling loss
10.2%
Last cleaned 8 Jun 2026
Performance ratio
72.8%
Baseline 79%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
2 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0126 | Lightning Protection | Dispatched | Rs 13.5K |
| JOB-2026-0022 | Residential Solar Maintenance | Scheduled | Rs 6.5K |