All services
Safety

Lightning Protection

Air terminals, down conductors and surge protection sized for the array.

Rs 1,800per kW

About 240 minutes on site

What is included

  • Earthing and bonding verified against measured resistance
  • DC isolation and fire-path clearance checked on every audit
  • Signed compliance record you can hand to an insurer
  • Technicians qualified in electrical, structural work

How it works

  1. 1You book online or call. We confirm the slot by phone.
  2. 2A technician with the right skills is assigned and dispatched.
  3. 3Generation readings are taken before the work starts.
  4. 4The work is carried out and every step is logged.
  5. 5Readings are taken again so the difference is documented.
  6. 6The report is published to your customer portal.